The FREMOdern meeting this time had a continuous double track route from Fiddleyard to Fiddleyard.
The route went from Germany via Denmark to Sweden.
In terms of passenger trains, only German and Danish trains were used. Here, 16 different DB and DSB passenger trains took care of the operation.
On the freight side, however, there was a lot of activity;
Since we had a German, two Danish and a Swedish combined terminal with us, intermodal traffic between these combined terminals was set up. A total of 22 intermodals drove between the terminals, 6 other freight trains provided local freight traffic and 1 freight train carried new sleepers from the sleeper concrete factory in each timetable.